Since the start of MINERGY’s establishment and 1st commercial operation in 1995, generation was largely driven by fossil fuels, particularly bunker and diesel oil.
Under the Diesel Business Unit, MINERGY constructed two Diesel Power Plants, the 18.9 MW Sulzer Diesel Power Plant and the 27.4 MW Wartsila Diesel Power Plant both located in Tablon, Cagayan de Oro City.